Steel Handling Gets a Boost at Arabian Transformers Co. Thanks to Verlinde Cranes

Working with regional partner Cranes and Steel, Verlinde delivered a bespoke overhead crane solution for Arabian Transformers Co., making the handling of heavy steel components safer and more efficient.

Industry
Heavy steel manufacturing
Location
Saudi Arabia
Products
The Verlinde EUROBLOC VT electric hoist
Arabian Transformers Co. Upgrades Steel Handling with Verlinde

CONTEXT AND CHALLENGE


When Arabian Transformers Co. (ATC), a manufacturer with expertise in steel structures and lifting technologies, required a dependable lifting solution to handle heavy steel components in Saudi Arabia, the company turned to Cranes and Steel, Verlinde's official and trusted distributor and partner across the Middle East. Cranes and Steel supplies Verlinde products including electric hoists, winches and lifting components, and also provides services such as maintenance, installation and after-sales support.


The project called for overhead cranes able to lift heavy steel components safely and precisely, all while adapting to site-specific challenges. Tight installation space meant runway beams and lifting equipment had to be precisely aligned, and the building's structural features called for tailored installation solutions.


Mr. Ansheel Haneef, Verlinde's Export Sales Manager for the Middle East & Africa, comments:


“Bringing together Verlinde and Crane and Steel's complementary strengths has driven strong market penetration and delivered impressive outcomes. By pairing our crane technology expertise with project execution capability in the Middle East, this partnership stands well-positioned for continued growth and lasting success.”

CONTEXT AND CHALLENGE


SOLUTION


To address the customer's varied lifting needs, Cranes and Steel engineered and installed a tailored overhead crane system with both single-girder and double-girder configurations. The cranes' lifting capacities were 3, 5, 10 and 30 tonnes, each running at 60 Hz.


Following a thorough site assessment, the team installed and aligned the runway beams, assembled the crane components, and integrated the electrical and control systems. Extensive testing confirmed safety and performance, and the team delivered detailed operator and maintenance training for the client to guarantee efficiency and safety while operating the crane.


For the lifting equipment, Cranes and Steel put forward the Verlinde EUROBLOC VT electric hoist for the client, as it was a strong fit for this type of application. EUROBLOC VT proved well suited to the demanding job of handling heavy steel components while maintaining safety, reliability and operational efficiency.

Arabian Transformers Co. Upgrades Steel Handling with Verlinde

Outcomes and key benefits

  • Improved safety, control and precision when working with large steel components.

  • Greater productivity thanks to optimized material handling operations.

  • Less downtime and a smoother workflow across the facility.

  • Full compliance with all necessary safety and performance standards.

  • Little disruption to the customer’s operations while installation took place

  • A scalable lifting solution that supports future operational growth.

  • The client also benefits from continued technical support, maintenance and upgrade options


Arabian Transformers Co. Upgrades Steel Handling with Verlinde

Stay ahead of the news.

Receive Verlinde's newest product launches, certifications and industry updates straight to your inbox.

More case studies

Browse all case studies

Together, let's find the solution that fits.